• Phone

    0086-0371-86151367

  • Address

    No. 285, Floor 18, Bldg. 1, No. 13-1, Dongfeng Rd., Jinshui Dist., Zhengzhou, Henan, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            High quality sterilizer uv sterilizer/0086-15514501051

                            High quality sterilizer uv sterilizer/0086-15514501051

                            High quality sterilizer uv sterilizer/0086-15514501051

                            High quality sterilizer uv sterilizer/0086-15514501051

                            High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

High Quality Sterilizer Uv Sterilizer, High Quality Ozone Sterilizing Cabinet,Ozone Sterilizer,Disinfection Sterilizing Cabinet
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Disinfecting Type:
Ozone, Ultraviolet Light
Installation:
Freestanding
Function:
sterilizer
Certification:
CE
Power (W):
600
Voltage (V):
220
Place of Origin:
Henan, China (Mainland)
Brand Name:
hongle
Model Number:
YTD-268A
Quality:
good
Overall dimension:
600*500*920(mm)
capacity:
260L
power:
600W
Sterilizing type:
Ozone light waves
material:
stainless steel
MOQ:
1 set/sets
Warranty:
1 year
Item:
Ozone sterilizing cabinet
Payment term:
T/T Western Union
Packaging & Delivery
Packaging Details
wooden package
Delivery Time
7 days after the payment

High quality sterilizer  uv sterilizer 

Product Description

   1.Low consumption and high efficient

  2.Stainless steel

  3.Controller temperature

  4. Automatic and easy operation

ModelYTD-268A
Overall dimension600*500*920mm
Capacity260L
Power600W
Sterillizing typeozone light waves

 

High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

High quality sterilizer uv sterilizer/0086-15514501051

Packaging & Shipping

 PACKAGE:

Standard export carton packing, fit for multiple handing and long distance marine shipping.

DELIVERY TIME:

3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

High quality sterilizer uv sterilizer/0086-15514501051

Company Information

High quality sterilizer uv sterilizer/0086-15514501051

Zhengzhou HongLe machinery & equipment co.ltd is engaged in the development, design, manufacture and sale of meat processing machinery. Zhengzhou HongLfood machinery factory over the years adopts many new ideas, absorbs a wide range of advanced technologies worldwide as well as excellent processing and testing equipment, and takes a reliable strict quality guarantee system and an important aftersales service system to win customers' trust in the industry.

 

We have strong technical force and standard management. Our existing products are related to the meat processing industry and flour product processing industry, including frozen meat grinders, cutting machines, mixers, saline injection machines, roll kneading machines, filling machines, vacuum and surface machines and mixing trap machines, totally 20 categories of products. 

 

We are willing to join hands with customers for common development and contribute to the revitalization of the food processing industry.

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.